Old MCO Bldg. Site Re-Development Ph-I

King Faisal Specialist Hospital & Research Center

  • slide

PROJECT DETAILS


  • Client King Faisal Specialist Hospital & Research Center
  • Project Old MCO Bldg. Site Re-Development Ph-I
  • Location Riyadh
  • Contract Period 150 Days
  • Contract Value SR. 3,849,920


PROJECT DESCRIPTION


Old MCO Bldg. Site Re-Development Ph-I

Demolition/Removal of Existing electrical System: Disconnecting and removal of all inactive electrical installation related to lighting system, power outlets, HVAC power system, Mechanical power system (Steam Generators, Expansion Tanks, Feed Tanks, Cooling Coils, Heating Coils etc) Cable trays, conduits, boxes, raceways, supports and hangers, wires, cables, switchboards, panelboards, disconnect switches, transfer switches, motor control panels, elevator system, Terminal cabinets, Low Current system (Telehone, BMS) Fire Alarm system devices and all electrical components in preparation for the new construction and Reloaction and Rerouting and installation of electrcal systems.nnFinishing: Suppy and installation of Doors, Windows, plastering walls, Vinyl wall covering etc.nnMechanical system: Relocation and Rerouting of steam pipelines, Chilled water pipelines, low pressure hot water pipelines, Domestic cold & hot water pipelines, Compressed air pipelines, Drain and Vent pipelines, Medical vacuum pipelines, Medical Gas pipeline, Medical air dual line regulator, Provisional sum for all plant rooms.


Share




Leave a Replay

Your email address will not be published.


Comment


Name

Email

Url


en_US